Home
Maintaining Standards

Primary links

  • Home
  • Services
    • Preventative Maintenance
      • Drag Brushing
      • Power Sweeping
      • Chemical Treatments
      • Infill Levels
      • Grooming
    • Corrective Maintenance
      • Seams and Joints
      • Granular Top Ups
      • Line Marking
      • Summer Revite®
      • Winter Revival™
      • Rejeneration®
      • Hydrotech®
    • Testing
      • FIFA RECOMMENDED 2* Pitches
    • Training
      • IOG Training Course
      • NVQ in Sport & Play Surfaces
    • Site Inspections
  • Sports
    • Football
    • Hockey
    • Tennis
    • Cricket
  • Machinery
    • R.E.D Range
      • R.E.D Range Update
    • SMG Range
      • SportChamp
    • Machinery Brochure
  • Equipment
    • AstroTech® Range
    • Equipment Brochure
  • Contact Us
  • About Us
    • Why Maintenance?
    • Company Brochure
    • Accreditations
    • Partners in Excellence
    • Eco//Drive
  • Latest News
  • Competition

//Newsletter SignUp

//External Links

  • www.iog.org
  • www.sapca.org.uk
  • astro-tech.co.uk
  • www.sow-green.co.uk

Recently Visited

Feature Image

NVQ Sport & Play

Feature Image

Nationwide Coverage Local Service

Feature Image

Pitch Problems

Summer Revite®

// Information

Revite® in Progress

Revite® gets deep into surface

Multiple machines for less downtime


‘Revite®’ is ideal to augment any ongoing synthetic surface maintenance programme. The process should be carried out annually or bi-annually dependent on levels of pitch usage and current maintenance procedures. The specialist brushing process is designed to get much deeper into the artificial carpet than conventional Power Sweeping as it is far more intense, de-compacting the surface as well as lifting the pile.

Due to the nature of the operation it is most effective during the summer months when the pitch surface is dry allowing the brushing action and powerful vacuum turbine to remove dust, debris and broken-down carpet fibres. Failure to remove such detritus will result in the contamination filtering down through the infill ultimately affecting drainage and the playing characteristics of the surface.

This specialist process can take anything up to 8 man days to complete, depending on the level of contamination present in the pitch and the age of the facility. However in normal operations Technical Surfaces help to minimise pitch downtime and seize the window of opportunity in the weather by employing several teams on the surface at one time. Call Technical Surfaces now to ensure you are booked into our Summer schedule of works and let us help you extend the life of your artificial facility. 

Related Information

Help & Advice

Feature Image

FIFA RECOMMENDED 2* Pitches

Feature Image

IOG Training Course

Feature Image

NVQ Sport & Play

//Contact Details

Technical Surfaces Limited
Standards House
Meridian East
Meridian Business Park
Leicester
LE19 1WZ
t:+44 (0)8702 400 700
f:+44 (0)8702 400 701
m:info@technicalsurfaces.co.uk

Secondary links

  • Case Studies
    • Education is Key
    • 20 Years and Still Going Strong
    • FIFA 2* STATUS
    • Maximise your return
    • Refurbishment saves £1000s
  • Terms & Conditions
  • Privacy
  • Acknowledgements
  • Company Information

Copyright

© Copyright 2010 Technical Surfaces Limited